..and more pics. (kinda big)
i started today and took out the wiring harness and took off the head so it would be easier to reach things.
i didnt have a strong enough impact for the axle nut so i had to take the whole rotor and shaft assembly out, man that took some time.
hopefully tomorow i will pull the block.
[Modified by baonest, 7:10 PM 9/24/2002]
[Modified by baonest, 7:11 PM 9/24/2002]
i didnt have a strong enough impact for the axle nut so i had to take the whole rotor and shaft assembly out, man that took some time.
hopefully tomorow i will pull the block.
[Modified by baonest, 7:10 PM 9/24/2002]
[Modified by baonest, 7:11 PM 9/24/2002]
takin the motor out... then puttin in my LS/vtec when im dont with it. i took the AC out.. the car was a theft recovery so ima be cleanin the engine bay and the inside..
Trending Topics
ah..doin' it the long and hard way
who is a reall good guy). the JUN head kits is gonna take a about a month to get here cuz it needs to be ordered from japan (ITRinEJ1 is takin care of that
). now i need flywheel/clutch combo from somone.. hmmmm [Modified by baonest, 12:40 AM 9/25/2002]
Thread
Thread Starter
Forum
Replies
Last Post




