The worst project delay ever... a house fire

Thread Tools
 
Search this Thread
 
Old Apr 7, 2013 | 03:46 AM
  #1  
wantboost's Avatar
Thread Starter
Who is Mr Robot?
iTrader: (2)
 
Joined: Jul 2004
Posts: 21,474
Likes: 10
From: ATL - Where the Pimps and Players dwell
Default The worst project delay ever... a house fire

So yesterday around 6:30 a wire in an outer wall decided it was time to quit, luckily we were both home and caught it as it started, took 5 minutes to climb 30 feet in 2-3 minutes. Fire department showed up stupid fast, 5 pump trucks, a ladder truck, two battalion chiefs and ambulance and two cops.

Luckily they got the fire out be not before cutting holes through the sub flooring n the 2nd story, big enough that I can get to the first floor that way... as well as basically punching holes everywhere to check for smoke/flame travel and removing most of the siding

Luckily the house is still standing (and my civic and Porsche were outside) but the house isn't live able, 1st floor is a swimming pool, plus we can't run water or gas or power until repairs start... and they are packing up the entire house for smoke remediation. Which means the civic goes back in storage so no work time on it.

They said it will take 3-4 weeks just to figure the total structural damage to the house and whats needed to do it.... and get approval. Plus we are looking at 1-3 months after approval to get the work done,


The basically have to replace everything in the house, flooring, sheetrock, paint, framing repair,textiles, outside siding, the porch has to be torn down and rebuilt, and the whole back half of the house and attic
Have to be taken back down to framing...

Weird part is it was a 12v security sensor line that cause all of it.


Now taking donations to complete project civic lol

Oh I'll have pics of the carnage later today
Reply
Old Apr 7, 2013 | 03:54 AM
  #2  
th3pwn3r's Avatar
Honda-Tech Member
 
Joined: Apr 2008
Posts: 919
Likes: 1
From: Chicago, Illinois, United States
Default Re: The worst project delay ever... a house fire

Sorry to hear man, at least everyone is safe, your cars included. Hopefully you find a decent place to live until everything is fixed.
Reply
Old Apr 7, 2013 | 07:34 AM
  #3  
crvtectim's Avatar
Honda-Tech Member
 
Joined: Dec 2009
Posts: 1,444
Likes: 3
From: Pensacola, FL.
Default Re: The worst project delay ever... a house fire

Wow man, that's a huge bummer! But you and yours are safe and that's the most important thing. Good luck with the rebuild.
Reply
Old Apr 7, 2013 | 07:44 AM
  #4  
2000GSRTypeR's Avatar
Honda-Tech Member
 
Joined: Mar 2012
Posts: 807
Likes: 0
From: Providence, Road Island
Default Re: The worst project delay ever... a house fire

Sorry to hear this sir.
Reply
Old Apr 7, 2013 | 08:58 AM
  #5  
Schister66's Avatar
Man U FTW
20 Year Member
 
Joined: Sep 2005
Posts: 11,973
Likes: 2
From: Phoenix, AZ
Default Re: The worst project delay ever... a house fire

Sorry for your loss, but at least you and your cars made it out alive
Reply
Old Apr 7, 2013 | 10:20 AM
  #6  
Mr.Spec's Avatar
Honda-Tech Member
 
Joined: Apr 2008
Posts: 626
Likes: 0
From: Fremont, CA, USA
Default Re: The worst project delay ever... a house fire

sorry to hear
Reply
Old Apr 7, 2013 | 11:37 AM
  #7  
mafia's Avatar
Honda-Tech Member
 
Joined: Feb 2005
Posts: 1,204
Likes: 0
From: twin falls, idaho, usa
Default Re: The worst project delay ever... a house fire

Sorry for your loss, when I was a kid are house chought on fire for a little, but insurance totaled it out because there was too much damage to frame. It's a shitty deal to go threw for sure.
Reply
Old Apr 7, 2013 | 12:51 PM
  #8  
4genaccordfreak's Avatar
Honda-Tech Member
20 Year Member
 
Joined: Jul 2003
Posts: 1,344
Likes: 1
From: Ontario & Alberta, Canada
Default Re: The worst project delay ever... a house fire

Sorry to hear about this.

Glad you and anyone you were with were not harmed. As it could have been much worse if you were asleep.

Hopefully you can get everything sorted out as quickly as possible and get back to normal life.
Reply
Old Apr 7, 2013 | 12:54 PM
  #9  
lostforawhile's Avatar
longest project ever
 
Joined: Sep 2009
Posts: 3,494
Likes: 2
From: on the south side of dixie, 1986 Accord Hatch
Default Re: The worst project delay ever... a house fire

who installed the security wiring that caused this? when I put in a system Im designing it myself, and everything carrying power is getting fused, a lot of systems carry current in the walls with no fuses. It's no different in a short then an unfused wire in your car
Reply
Old Apr 7, 2013 | 01:00 PM
  #10  
rich7777's Avatar
Honda-Tech Member
 
Joined: Nov 2008
Posts: 3,379
Likes: 0
From: Birmingham, UK
Default Re: The worst project delay ever... a house fire

Damn Wantboost sorry to hear man !
Reply
Old Apr 7, 2013 | 01:16 PM
  #11  
speedjunkie_g35's Avatar
Honda-Tech Member
 
Joined: Sep 2010
Posts: 3,114
Likes: 5
From: Pensacola, FL and every Court House in Louisiana
Default Re: The worst project delay ever... a house fire

Glad everyone is ok!!! A horrible experience to deal with.
Reply
Old Apr 7, 2013 | 01:37 PM
  #12  
wantboost's Avatar
Thread Starter
Who is Mr Robot?
iTrader: (2)
 
Joined: Jul 2004
Posts: 21,474
Likes: 10
From: ATL - Where the Pimps and Players dwell
Default Re: The worst project delay ever... a house fire

Yea its pretty shitty, between smoke damage and fire, not to mention the added damage from the fire department, its bad. Water everywhere and the whole interior of the house has to be demolished due to smoke.

Hell all of my carbon fiber parts and my braided lines smell like smoke
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
EJ_ALLMOTA
Honda / Acura
76
Apr 11, 2013 05:47 PM
koji126
Acura Integra Type-R
18
Apr 26, 2008 04:51 PM
no1knows908
Honda Prelude
2
Jul 5, 2007 10:33 PM
HMan
Honda Motorcycles
42
Apr 4, 2005 01:35 PM




All times are GMT -8. The time now is 09:46 AM.