tial 38mm w/g
i'm having a dump tube made for the w/g and i'm curious on how much pressure is coming out to the dump tube if im running 10 lbs. ? also how hot is this dump going to be. reason is im wonder if its safe to run a thick rubber hose connected to the new dump flange a couples of inches off ? lmk guys thanx
It wont be as hot as the downpipe but it will be hot enough to melt things that it touches. A few inches away should be ok. Alot of people have vacuum lines and hoses around the area without problems.
<TABLE WIDTH="90%" CELLSPACING=0 CELLPADDING=0 ALIGN=CENTER><TR><TD>Quote, originally posted by Muckman »</TD></TR><TR><TD CLASS="quote">It wont be as hot as the downpipe but it will be hot enough to melt things that it touches. A few inches away should be ok. Alot of people have vacuum lines and hoses around the area without problems.</TD></TR></TABLE>
Thread
Thread Starter
Forum
Replies
Last Post
FastCougar
Welding / Fabrication
13
Sep 20, 2007 08:47 PM
ATS*Mark
Forced Induction
32
May 16, 2005 05:43 AM
yusoslo
Forced Induction
6
Feb 16, 2004 11:30 AM



