Notices
Honda Civic / Del Sol (1992 - 2000) EG/EH/EJ/EK/EM1 Discussion

what i need to change in order to put D16Z6 in 99' 1.4 civic HB ?

Thread Tools
 
Search this Thread
 
Old 09-22-2005, 11:37 AM
  #1  
Thread Starter
 
HB crazy's Avatar
 
Join Date: Apr 2005
Location: NATANYA, ISRAEL, ISRAEL
Posts: 98
Likes: 0
Received 0 Likes on 0 Posts
Default what i need to change in order to put D16Z6 in 99' 1.4 civic HB ?

what are the parts that i need to change in order to put the D16Z6 engine in 99' 1.4L civic HB ?

think you....
Old 09-22-2005, 01:12 PM
  #2  
Honda-Tech Member
 
gotboostedvr6's Avatar
 
Join Date: Sep 2004
Location: east tri state, us
Posts: 3,434
Likes: 0
Received 0 Likes on 0 Posts
Default Re: what i need to change in order to put D16Z6 in 99' 1.4 civic HB ? (HB crazy)

dont know but id buy the 1.4 crank and rods off you and help you get parts you need
Old 09-24-2005, 10:34 AM
  #3  
Thread Starter
 
HB crazy's Avatar
 
Join Date: Apr 2005
Location: NATANYA, ISRAEL, ISRAEL
Posts: 98
Likes: 0
Received 0 Likes on 0 Posts
Default Re: what i need to change in order to put D16Z6 in 99' 1.4 civic HB ? (gotboostedvr6)

<U>someone ?????</U>
Old 09-26-2005, 06:30 AM
  #4  
Honda-Tech Member
 
gotboostedvr6's Avatar
 
Join Date: Sep 2004
Location: east tri state, us
Posts: 3,434
Likes: 0
Received 0 Likes on 0 Posts
Default Re: what i need to change in order to put D16Z6 in 99' 1.4 civic HB ? (HB crazy)

what will swap from the 1.4 to the z6
your mounts except one hole on the drivers upper will need to be elongated
axels
alternator
p/s pump
a/c compresser
cooling lines

which intake manifold did the 1.4 come with is it down draft or side draft ?
how many pin's does the idle air control valve have?
are the o2 sensors 4 wire?

if you use a obd2 sohc vtec ecu you will need to use a knock sensor

like i said before, if you need help sourcing out parts lmk because i would really like to have the crank and rods from the 1.4

Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Cesar Ramirez
Introduce Yourself
0
12-01-2018 10:43 AM
Rob§
Want to Buy
2
05-28-2010 04:21 PM
xkrazyxjbrkerx75
Honda Civic / Del Sol (1992 - 2000)
1
11-22-2009 11:43 AM
sloweredcivic
Honda CRX / EF Civic (1988 - 1991)
1
01-04-2004 07:48 PM
Roadracejunkie
Honda Civic / Del Sol (1992 - 2000)
4
10-14-2003 01:01 PM



Quick Reply: what i need to change in order to put D16Z6 in 99' 1.4 civic HB ?



All times are GMT -8. The time now is 03:52 PM.