what i need to change in order to put D16Z6 in 99' 1.4 civic HB ?
#1
Thread Starter
Join Date: Apr 2005
Location: NATANYA, ISRAEL, ISRAEL
Posts: 98
Likes: 0
Received 0 Likes
on
0 Posts
what i need to change in order to put D16Z6 in 99' 1.4 civic HB ?
what are the parts that i need to change in order to put the D16Z6 engine in 99' 1.4L civic HB ?
think you....
think you....
#2
Honda-Tech Member
Join Date: Sep 2004
Location: east tri state, us
Posts: 3,434
Likes: 0
Received 0 Likes
on
0 Posts
Re: what i need to change in order to put D16Z6 in 99' 1.4 civic HB ? (HB crazy)
dont know but id buy the 1.4 crank and rods off you and help you get parts you need
#4
Honda-Tech Member
Join Date: Sep 2004
Location: east tri state, us
Posts: 3,434
Likes: 0
Received 0 Likes
on
0 Posts
Re: what i need to change in order to put D16Z6 in 99' 1.4 civic HB ? (HB crazy)
what will swap from the 1.4 to the z6
your mounts except one hole on the drivers upper will need to be elongated
axels
alternator
p/s pump
a/c compresser
cooling lines
which intake manifold did the 1.4 come with is it down draft or side draft ?
how many pin's does the idle air control valve have?
are the o2 sensors 4 wire?
if you use a obd2 sohc vtec ecu you will need to use a knock sensor
like i said before, if you need help sourcing out parts lmk because i would really like to have the crank and rods from the 1.4
your mounts except one hole on the drivers upper will need to be elongated
axels
alternator
p/s pump
a/c compresser
cooling lines
which intake manifold did the 1.4 come with is it down draft or side draft ?
how many pin's does the idle air control valve have?
are the o2 sensors 4 wire?
if you use a obd2 sohc vtec ecu you will need to use a knock sensor
like i said before, if you need help sourcing out parts lmk because i would really like to have the crank and rods from the 1.4
Thread
Thread Starter
Forum
Replies
Last Post
xkrazyxjbrkerx75
Honda Civic / Del Sol (1992 - 2000)
1
11-22-2009 11:43 AM
sloweredcivic
Honda CRX / EF Civic (1988 - 1991)
1
01-04-2004 07:48 PM
Roadracejunkie
Honda Civic / Del Sol (1992 - 2000)
4
10-14-2003 01:01 PM