I melted a vac line over the weekend so I put a new 1/4 tubing line on And covered it with the DEI Flame wrap.. Just waiting on one more for the other line.
Also Upgraded to some Metal push lock lines on the gate.. Probably not 100% needed but with the excess heat near the manifold I figured it wasn’t a bad idea getting rid of the plastic push locks in favor of these!