cost of assembly of shortblock?? Laskey ERL GE all big builders post please
Local Machine shop wants to charge me $800 to assemble my engine. im giving them all the parts as well
81mm bored to 81.25
Rods pressed onto pistons
Micropolish crank
balance
install bearings
81mm bored to 81.25
Rods pressed onto pistons
Micropolish crank
balance
install bearings
at 100 an hour, thats 8 hours.
clean, measure, blueprint, sub assemble (block and crank, then rods and pistons), assemble, put on head, tq head, put in cams, adj valves. seems like a bargain if they know what they are doing.
all that at 50 an hour is still atleast 1000 im guessing, i have never really timed how long it has taken me to assemble an engine.
i will guess double j and stewart will be much more than that.
reading original post, depending on their ability, that may not be too bad for a short block.
clean, measure, blueprint, sub assemble (block and crank, then rods and pistons), assemble, put on head, tq head, put in cams, adj valves. seems like a bargain if they know what they are doing.
all that at 50 an hour is still atleast 1000 im guessing, i have never really timed how long it has taken me to assemble an engine.
i will guess double j and stewart will be much more than that.
reading original post, depending on their ability, that may not be too bad for a short block.
<TABLE WIDTH="90%" CELLSPACING=0 CELLPADDING=0 ALIGN=CENTER><TR><TD>Quote, originally posted by RedneckRicer »</TD></TR><TR><TD CLASS="quote">Local Machine shop wants to charge me $800 to assemble my engine. im giving them all the parts as well
81mm bored to 81.25
Rods pressed onto pistons
Micropolish crank
balance
install bearings</TD></TR></TABLE>
$800 for the machining and assembly? I think that is a pretty good deal!
81mm bored to 81.25
Rods pressed onto pistons
Micropolish crank
balance
install bearings</TD></TR></TABLE>
$800 for the machining and assembly? I think that is a pretty good deal!
800 bones is not bad.
the place that did mine charged me roughly 450-500 for bottom end machine/assembly. that included bearings.
to have the crank micropolished and have it balanced allong with the rods/pistons/flywheel/pressure plate was another 350-400
the place that did mine charged me roughly 450-500 for bottom end machine/assembly. that included bearings.
to have the crank micropolished and have it balanced allong with the rods/pistons/flywheel/pressure plate was another 350-400
Thread