It'll only take 2 hours 3 at most!
This is dedicated to all the people that use your garage and say it will take a few hours at most. My good friend needed to replace a few front sub frame bushings on his SRT4 and needed to use my garage. Of course being the nice guy I am I said sure since I was detailing my car and not using the other side anyways. Turns out it took 2 days which was fine my car took the same. Enjoy the pics. Comments always welcome.
Just a few of the products used.


These are the pre wax shots and right after a polish with some menzerna polish on 7.5in waffle weave foam pad and porter cable.

After wax and tires dressed.







Some random pics of his car. I detailed a few spots on his car. The brakes are the first up the factory painted calipers show a lot of brake dust and dirt.
Before:

After:

Wheel well before:

After:

Rims before and after:


And heres a few shots of the work we did on his car.







Just a few of the products used.


These are the pre wax shots and right after a polish with some menzerna polish on 7.5in waffle weave foam pad and porter cable.

After wax and tires dressed.







Some random pics of his car. I detailed a few spots on his car. The brakes are the first up the factory painted calipers show a lot of brake dust and dirt.
Before:

After:

Wheel well before:

After:

Rims before and after:


And heres a few shots of the work we did on his car.







Thread
Thread Starter
Forum
Replies
Last Post



