When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
Re: DB Squad.....for the Teggers with 2 extra doors
Well...this is what I'll be working on this winter season. I need to get it road ready for my lil sister. This was handed down from another sibling in the family. It has a strong b20 in there, automatic will need to be rebuild (don't care about 5spd chatter, no time to teach a young buck how to drive).
98-01 front end
Re: DB Squad.....for the Teggers with 2 extra doors
What up kinda new here. Been on and off on this thread
just pick another db7 with front
slowing replacing part left n right since it a theft recovery shell.
Anyway pick from the day i got it to now
as u can see in the picture
paint was dull and full of greasy finger print that wouldnt come off unless i do 3stage of buffing. also im really picking about db. Gotta have straight body no stupid wavy rear quarter from shitty roll.
I recently sold my eg ferio inspired build and pick this up for good deal.
Re: DB Squad.....for the Teggers with 2 extra doors
My tumbler came in, I picked up walnut grinds from the pet store. I had my rear suspension bolts in the tumbler overnight and wow. I'm waiting for my zinc coating items to come in and we'll see how the weekend goes. I need to get started on the front suspension so hopefully all goes well.
Re: DB Squad.....for the Teggers with 2 extra doors
So pissed....got everything back together on the driver side and realized I don't have the dust cover for the rear axle nut....gotta order it cuz no one around here has it in stock.
Re: DB Squad.....for the Teggers with 2 extra doors
Sigh....well back to work now that the holiday season is over, although chinese new yrs is around the corner. I gotta back the tacoma out of the garage and re-center the db7 again to work on the front suspension.
Re: DB Squad.....for the Teggers with 2 extra doors
Originally Posted by Lasty K
WASSUP DEBO lol
been a while
dang.... watsup lasty. hahah yeah its has been a very long while. ive been good bruhh. hope your doing well too. i think i might grab another db when i get back
Re: DB Squad.....for the Teggers with 2 extra doors
Waiting for additional suspension parts to come in. Moved on to working on the exhaust. Removed headers and cat converter. **** needs to be replaced and new gaskets put in.
Re: DB Squad.....for the Teggers with 2 extra doors
header work is done and cleaned as best I can, new rack and pinion arrived, waiting for powersteering pump o-ring kit and bearing to come in. all bushings are replaced, well I still have to pick up the front lca's but they should be done anyways.