Notices

How long did your motor build take?

Thread Tools
 
Search this Thread
 
Old 06-26-2005, 11:17 AM
  #1  
Thread Starter
 
Quad-Damag's Avatar
 
Join Date: Feb 2003
Location: Street, CA, USA
Posts: 4,304
Likes: 0
Received 0 Likes on 0 Posts
Default How long did your motor build take?

Most people who fully build there motor

ie. sleaved, pistons, rods, headwork, tranny work, fully built and boosted

how long did it take for your guys motor to be done, and did you have a shop do it, or you did the work yourself
Old 06-26-2005, 12:13 PM
  #2  
BCICAN
 
Dunc's Avatar
 
Join Date: Jan 2005
Location: Cincinnati, OH
Posts: 3,218
Likes: 0
Received 1 Like on 1 Post
Default Re: How long did your motor build take? (Quad-Damage)

I'd only had my car since last April (2004).

First phase
Headwork/turbo: ~2 weeks
.5mm bore/rods/pistons: 5 days

Second phase
Currently happening:
sleeves/new rods/new pistons/tranny/many misc. parts: ~3 weeks
Old 06-26-2005, 12:20 PM
  #3  
Honda-Tech Member
 
Rod.'s Avatar
 
Join Date: Mar 2003
Location: TX
Posts: 4,151
Likes: 0
Received 0 Likes on 0 Posts
Default Re: How long did your motor build take? (Dunc)

i say it took me 6-7 months for everything.

Had a shop do all the bottom end work
Old 06-26-2005, 12:31 PM
  #4  
Honda-Tech Member
 
s2kdre's Avatar
 
Join Date: Sep 2003
Location: Skmotoring.com
Posts: 2,438
Likes: 0
Received 0 Likes on 0 Posts
Default Re: How long did your motor build take? (redturbocivic)

3 weeks for machine work and 1hr putting the block together. And about a day taking the old motor out, i like to take my time and do it right.
Old 06-26-2005, 04:58 PM
  #5  
Honda-Tech Member
iTrader: (1)
 
mike1114's Avatar
 
Join Date: Mar 2003
Location: I drink Seafoam and poo into catch cans, USA
Posts: 3,215
Likes: 0
Received 2 Likes on 2 Posts
Default Re: How long did your motor build take? (jdmhonda)

It took me 6 months total. Almost to the day!!

2-3 weeks machine work and I did the rest myself in a garage on jackstands.
Old 06-26-2005, 05:28 PM
  #6  
 
turbodohcsi's Avatar
 
Join Date: Jun 2004
Location: atlanta, ga
Posts: 466
Likes: 0
Received 0 Likes on 0 Posts
Default

as fast as i could get the money
Old 06-26-2005, 08:51 PM
  #7  
Honda-Tech Member
 
USDM 4G VTEC's Avatar
 
Join Date: Apr 2002
Location: OH
Posts: 4,834
Likes: 0
Received 1 Like on 1 Post
Default

took me 1 mth
i had to rely in waiting for parts in the mail, the block and head at the machine shop
and time to get my *** between work and family to built it and have it properly done
Old 06-26-2005, 08:55 PM
  #8  
Who is Mr Robot?
iTrader: (2)
 
wantboost's Avatar
 
Join Date: Jul 2004
Location: ATL - Where the Pimps and Players dwell
Posts: 21,474
Likes: 0
Received 10 Likes on 10 Posts
Default Re: (USDM 4G VTEC)

about a month and 5k. my built gsr head should be here at the end of this week... i did all of the labor myself.
Old 06-26-2005, 09:56 PM
  #9  
Honda-Tech Member
 
Haleiwa-Brando's Avatar
 
Join Date: Jul 2004
Posts: 4,909
Likes: 0
Received 0 Likes on 0 Posts
Default Re: (turbodohcsi)

<TABLE WIDTH="90%" CELLSPACING=0 CELLPADDING=0 ALIGN=CENTER><TR><TD>Quote, originally posted by turbodohcsi &raquo;</TD></TR><TR><TD CLASS="quote">as fast as i could get the money</TD></TR></TABLE>

...and about 8 months for me.
Old 06-26-2005, 11:17 PM
  #10  
Honda-Tech Member
 
careawholelot's Avatar
 
Join Date: May 2002
Location: goldenstate heavyweight, ca, us
Posts: 2,595
Likes: 0
Received 0 Likes on 0 Posts
Default Re: (Haleiwa-Brando)

i'm going on 6 months right now, will prolly be done in august and about $7000 spent.
Old 06-26-2005, 11:52 PM
  #11  
Honda-Tech Member
 
flip1199's Avatar
 
Join Date: Mar 2002
Location: sacramento, ca, usa
Posts: 3,818
Likes: 0
Received 0 Likes on 0 Posts
Default Re: (careawholelot)

took me a little over a year would have been done sooner but decided to change my turbo setup in the middle of my build. most of the wait time was due to waiting on the machine shop to finish my block (RS machine) took atleast 2 months. did all the assembly myself and droped the motor in myself also. took about a total of about 2-3days
Old 06-27-2005, 03:24 AM
  #12  
 
EnzoSpeed's Avatar
 
Join Date: May 2005
Location: Simi Valley, CA, USA
Posts: 1,789
Likes: 0
Received 1 Like on 1 Post
Default Re: (flip1199)

I'm still goin' strong right now. I pulled the motor out 3 weeks ago. I stripped the engine bay to the frame, cleaned it, cleaned everything that came out, did a wire tuck, and then put it all back. Now I'm in the process of building the motor. Just need a few more tools, but I'm scouring ebay for a dial bore gauge set.


I should have the new motor built and dropped in within the next 3 weeks. Then I'll start the welding on my ic piping and dp.


Oh, and I took a million pics of everything. I'm going to have a killer write-up when I'm done.

Old 06-27-2005, 06:18 AM
  #13  
Honda-Tech Member
 
EK_GSR's Avatar
 
Join Date: Aug 2004
Location: Miami, FL, USA
Posts: 248
Likes: 0
Received 0 Likes on 0 Posts
Default Re: (EnzoSpeed)

i had a shop to it in less than a week.... he had it for a while but i didnt give him the parts for 2 weeks.... and he finished it up in no time at all...
Old 06-27-2005, 06:21 AM
  #14  
Honda-Tech Member
 
BoostedEG6's Avatar
 
Join Date: Aug 2004
Location: Mechanicsville VA
Posts: 2,318
Likes: 0
Received 0 Likes on 0 Posts
Default Re: (EK_GSR)

took me a couple weeks and about 12-13K for everything from start to finish..... the only thing I didnt do was the bottom end, I had a machine shop do that..
Old 06-27-2005, 06:36 AM
  #15  
Member
 
dasher's Avatar
 
Join Date: Apr 2002
Location: Somewhere in, FL, USA
Posts: 1,842
Likes: 0
Received 1 Like on 1 Post
Default Re: How long did your motor build take? (Quad-Damage)

It doesn't take long if you know what you are doing.... I can build a motor in 1 day, 2 days if I'm building the head also, even if I take my time.... What is time consuming is waiting for parts to come in and the machine shop to finish their work...
Old 06-27-2005, 06:37 AM
  #16  
Moderator in Chief
iTrader: (2)
 
Muckman's Avatar
 
Join Date: Sep 2001
Location: Buffalo, NY
Posts: 9,506
Likes: 0
Received 4 Likes on 4 Posts
Default Re: How long did your motor build take? (Quad-Damage)

From engine hoist to hoist it was about 10 weeks for me.
Old 06-27-2005, 06:39 AM
  #17  
Mr. Badwrench
 
boostedcivicsir's Avatar
 
Join Date: May 2002
Location: stranger in a strange land
Posts: 14,146
Likes: 0
Received 2 Likes on 2 Posts
Default Re: How long did your motor build take? (Quad-Damage)

since my machine shop did my sleeving, and my engine was the first they have done, it took them a month for the sleeving and line honing. as for me, once i got all the parts in, it took me about a day to build the engine, less the 24 hours to get the correct head studs in, ordered the correct ones, jegs sent me ls studs, i needed b16 studs.
Old 06-27-2005, 07:31 AM
  #18  
Member
 
adseguy's Avatar
 
Join Date: May 2004
Location: Nashville, TN, U.S.A
Posts: 2,992
Likes: 0
Received 0 Likes on 0 Posts
Default Re: How long did your motor build take? (boostedcivicsir)

I was thinking about doing my first pistons and rods build. I'm not scared of doing it myself since I have a helms and have found a good amount of build articles, but I am scared that it will cost me more in tools then it will in labor charges for someone to do it. Not to steer too far off topic, but how much did you guys need to spend in tools? What tools are vital and which ones can I get away without? I don't want to buy a $500 engine lifter thingamajig (whatever it's called) and only use it once . Gimme some round about costs...Thanks
Old 06-27-2005, 02:25 PM
  #19  
 
EnzoSpeed's Avatar
 
Join Date: May 2005
Location: Simi Valley, CA, USA
Posts: 1,789
Likes: 0
Received 1 Like on 1 Post
Default Re: How long did your motor build take? (adseguy)

Just this week I spent the following:

$200 for a used 0-6" Mitutoyo micrometer set
$80 for a Summit ring filer
$50 for a proform bolt stretch gauge
$20 for a digital caliper
$150 for a Mitutoyo dial bore gauge

That's pretty much it. Everything was from ebay except the caliper (harbor freight).

The retail on all that stuff is over a grand, so ebay is your best bet. And you don't really need a full micrometer set, just a 2-3" and a 3-4".
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Kelly.
Forced Induction
13
01-05-2005 11:08 AM
Ri5e
Forced Induction
26
10-03-2003 03:32 PM
hmongdude
Tech / Misc
2
05-02-2003 03:54 PM
mike2016
Forced Induction
16
07-05-2001 11:41 PM



Quick Reply: How long did your motor build take?



All times are GMT -8. The time now is 04:40 AM.