![]() |
finally getting going again!!!
well after two hurricanes and about 6 months of doing nothing to the car.... im ready to start working on her again!!!
The motor is assembled in the spare room just need to bolt on minor stuff like timing belt and brackets and do a valve lash. Golden eagle sleeved w/ 9:5:1 compression cps on eagles b16 head with supertech valvetrain and victor edelbrock manifold on stock throttle body w/ gsr tranny ramhorn manifold with t3 60-1 w .82 ar and stage 5 wheel 3 inch dp tial 50mm bov and tial 41mm wg still need to make dp and dt along with weld flange for bov onto piping then put her in the car and bring her to MR CLEAN lol ha ha TONY PALO |
| All times are GMT -8. The time now is 07:00 AM. |
© 2026 MH Sub I, LLC dba Internet Brands