With four weeks till the IFO event in Tucson we decided to see if we could put together a car in that time frame.

Basically boss man picked up this eg hatch with an a2 in it.


Original plan was just to do paint and body work and drive it till it resold. So the body work began.




Then it was decided that we should see what it could do all motor....



Motor was too small so we yanked it and sold it. While the motor is our we decided to just clean up the bay a bit. So a mild tuck is under way...




Motor showed up a few days later

Welding up the bay

body work in the bay


primered the bay


our to do list


more smoothing


laying down new seam sealer


Pulled the subframe and painted it


laying some base coat in the bay


Bay painted and subframe back in




TIME LAPSE OF THE BAY WORK
http://youtu.be/CnH7HD8CQCQ



Base coat on the body


exterior done




TIME LAPSE OF THE EXTERIOR PAINT
http://youtu.be/94ZTyIaRiOQ


put the dash back in

Started running wiring


MORE sanding lol

What hours of sanding amounts to




Started bolting stuff into the bay

then it resembled a car again


Went shopping at honda for some motor goodies



4pistonsracing overnighted us some parts to make some good power


Got the head back from all motor mike last night


Assembled the valvetrain


Boost Junkyz Dan welded up some AN fittings for the valve cover



Painted it


long block was done


Finished up the wiring


Motor went in


Mock up on the modified rbc intake


all welded up mounting the 90mm q45 throttlebody


mounted


Engine bay all done and threw it on the dyno






Slick setup



ENGINE ASSEMBLY AND DYNO VIDEO
http://youtu.be/nXTgckLUOQ0

LAtest updates on our facebook ( http://www.facebook.com/pages/Suprem...ref=ts&fref=ts ) page... will have track videos this weekend
Old 10-19-2012, 07:13 AM
  #2  
Honda-Tech Member
 
enzor's Avatar
 
Join Date: May 2012
Posts: 6
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

Great job guys.
Old 10-19-2012, 07:28 AM
  #3  
Honda-Tech Member
 
^Sammy]!.'s Avatar
 
Join Date: Jul 2002
Location: 9/11/01 WTC Never Forget, United States Of America
Posts: 6,487
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

Old 10-19-2012, 11:01 PM
  #4  
Honda-Tech Member
Thread Starter
 
Frost_White_CX's Avatar
 
Join Date: Apr 2008
Location: Phoenix, AZ, USA
Posts: 29
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

We were hoping to get some track time tonight... but having second gear issues. Sucks
Old 10-20-2012, 02:08 AM
  #5  
Honda-Tech Member
 
john dc2's Avatar
 
Join Date: Nov 2011
Posts: 9
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

really nice build what power did it make?
Old 10-21-2012, 05:13 PM
  #6  
Honda-Tech Member
Thread Starter
 
Frost_White_CX's Avatar
 
Join Date: Apr 2008
Location: Phoenix, AZ, USA
Posts: 29
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

Messed up the bell housing trying to get a defective spec twin disc to fit... Track will just have to wait a week.
Old 10-22-2012, 07:18 AM
  #7  
Honda-Tech Member
 
latino honda's Avatar
 
Join Date: Oct 2007
Location: SARASOTA, FL, USA
Posts: 144
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

Badass nice set up
Old 11-25-2012, 08:36 AM
  #8  
Honda-Tech Member
Thread Starter
 
Frost_White_CX's Avatar
 
Join Date: Apr 2008
Location: Phoenix, AZ, USA
Posts: 29
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

Little update. Car went 11.8@ 119 missing second gear. Trans is out again with a chewed up third gear synchro sleeve.

Have a joe McCarthy 9.0 intake manifold we will be dyno testing this week.
Old 11-27-2012, 11:54 AM
  #9  
Honda-Tech Member
iTrader: (5)
 
crazyjetsfan22's Avatar
 
Join Date: Oct 2006
Location: NY
Posts: 6,032
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

Specs on the motor?
Old 11-27-2012, 01:17 PM
  #10  
Honda-Tech Member
 
mf10_eg88's Avatar
 
Join Date: Jan 2009
Posts: 524
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

nice work on the car and the intake mani and well.
Old 11-27-2012, 01:20 PM
  #11  
Honda-Tech Member
 
trashyhatch's Avatar
 
Join Date: Mar 2012
Posts: 386
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

more than amazing work considering the time of the build! good job
Old 11-27-2012, 02:36 PM
  #12  
Honda-Tech Member
 
skylinerb26dett's Avatar
 
Join Date: Feb 2009
Location: Wisconsin
Posts: 539
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

looks nice! quick question, what seam sealer did you use. and did u take the old stuff off or just add to it>?
Old 11-27-2012, 03:54 PM
  #13  
Honda-Tech Member
 
AverageHonda's Avatar
 
Join Date: Nov 2012
Posts: 5
Likes: 0
Received 0 Likes on 0 Posts
Default Re: Our little 3 week long from the ground up project.. K24 inside

looking great!
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
SlowPokeEg
Appearance Build Threads
154
01-08-2014 11:09 AM
3.504
Honda / Acura
3
07-29-2006 05:29 PM
dxhatch92
Honda / Acura
39
01-16-2006 03:15 PM
redlinetuning
Honda / Acura
19
08-31-2004 07:26 PM


Thread Tools
Search this Thread
Quick Reply: Our little 3 week long from the ground up project.. K24 inside



All times are GMT -8. The time now is 05:15 AM.